Talk:Larrivée Forum Guitars

From Bose Portable PA Encyclopedia
Revision as of 20:15, 20 December 2009 by ST (talk | contribs) (Forum III Shipping Dates)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Forum III Shipping Dates

The Forum III Guitar was shipped March 16, 2009. There was a factory tour of the Vancouver, BC plant where these were built.

You might want to restate that, saying the guitars "started" shipping on March 16, 2009. Larrivee shipped the guitars to Jim Holler at his request, he was receiving about 6 a day I believe. He did not want all 78 guitars shipped at once because he had to set each one up and didn't have the room for that many guitars, plus he had his regular daily business to take care of. As I stated somewhere else The ordering started early Dec 2008 and I received mine 4/25/2009. Lucky #13

Source: Mr LV19E